Edgerton sits in Rock County, Wisconsin, about 28 miles from our Madison base. Rock County panels battle both highway dust and farmland drift year-round — and Edgerton installs share that profile. Whether it's a residential rooftop or a small commercial array, panels here see the kind of buildup that rain alone simply can't remove.
Every city has its own soiling profile. Here's what your panels in Edgerton face that generic “just let the rain handle it” advice can't solve:
I-90 corridor diesel particulate and tire dust
Rock County corn and soybean field drift (May–October)
Rock River valley humidity bonding soil to panel glass
Industrial drift from the Illinois state line southward
We serve Edgerton and surrounding Rock County neighborhoods (53534). Landmarks nearby: the Sterling North Book & Film Festival heritage downtown. Typical response within 48 hours of quote acceptance.
Alliant Energy charges 15.50¢/kWh to residential customers in Edgerton. A typical 20-panel system produces about 8,600 kWh/year — a conservative 8% soiling loss means you're paying $107 per year for electricity your own panels should have made.
Est. Annual Loss
$107
Per 20-panel home, 8% soiling
Utility Rate
15.50¢
Alliant Energy
Water Hardness
20-25 gpg
Classified "very hard"
Drive From Base
28 mi
Standard mileage included
Landmarks nearby: the Sterling North Book & Film Festival heritage downtown. The very hard municipal water in Rock County (20-25 grains per gallon) is exactly why garden-hose cleaning leaves mineral spots — our 100% deionized rinse leaves zero residue.
Residential solar panel cleaning in Edgerton is $7 per panel (1-story, $150 minimum) or $9 per panel (2-story, $215 minimum) — we charge whichever is greater, never both. Standard mileage from our Madison base (28 miles to Edgerton) is included in the final emailed quote. Commercial and agricultural sites in Rock County are custom-bid within 24 hours.
Edgerton panels face i-90 corridor diesel particulate and tire dust, plus very hard municipal water (20-25 grains per gallon) that leaves mineral spots if homeowners try to rinse with a garden hose. At Alliant Energy's 15.50¢/kWh residential rate, a typical 20-panel Edgerton system loses roughly $107/yr of production to soiling — recoverable in one professional cleaning.
Yes. We serve Edgerton (53534) and every surrounding community in Rock County, Wisconsin. Typical response is within 48 hours of quote acceptance. Landmarks in our Edgerton service area include the Sterling North Book & Film Festival heritage downtown.
Installed 2009. Never cleaned in 16 years. +16.7% measured production lift after one visit. If Wisconsin's most iconic rooftop needed it, your Edgerton install probably does too.
See the workWe cover the surrounding Rock County area — explore nearby cities: